Terminal 3
Harry Reid International Airport
Project Details
ROLE
Mechanical Subcontractor
CONTRACT AMOUNT
$148 Million
OWNER
Clark County Department of Aviation
LOCATION
Las Vegas, NV
ARCHITECT
PGAL
SIZE
1.9 Million Square Feet
COMPLETION
2012
Project Description
The 14-gate Terminal 3 includes an added terminal building with an elevated roadway structure fronting the facility, over-roadway pedestrian bridges, underground automated transit system infrastructure, and an aircraft ramp. The terminal has its own retail concessions, parking and ticketing.
The 1,900,000-square-foot terminal building includes a basement, three upper levels and roof-level penthouses. The building houses a baggage handling system for outbound and inbound processing, and an in-line explosives detection system for baggage screening. The building’s infrastructure is designed with extensive cabling for software interfaces. Other features include dynamic and static signage, way finding systems and Voice-over-Internet Protocol (VoIP). The elevated roadway extends the length of the terminal – approximately 90 feet wide and 2,000 feet long. Construction of the elevated roadway included a concrete box girder with cast concrete columns.
Photo Credits: Dana Hoss Photography